This per square metre range is our own planning figure, a rough range as of 2026, calculated from the projects we plan and build as renovations on Mallorca. It is wide because the condition of the building only becomes clear once walls and floors are opened up.

Most cost guides give you a table of price tiers. Here we explain what takes a finca budget from the bottom of that range to the top, because that is what you can influence before you commit.

Why we do not give a narrower range

The range of roughly 1,200 to 2,500 € per square metre (as of 2026, rough range) covers a full renovation: structure where it is needed, services renewed, floors, walls, bathrooms, kitchen, joinery, in short, a fully renovated house. The bottom of the range is a structurally sound building with a modest, well judged specification. The top is a building that needed structural work before anything visible could begin, finished to the standard of a high-quality new build.

Anyone who gives you a single figure per square metre for a finca before seeing the building is guessing, or working from assumptions they have not told you about. Fincas have often been built up over several centuries, with each generation adding what it needed using the materials it had. Two houses of identical size in the same valley can sit at opposite ends of the range. The reason is almost always the condition of the fabric, and very rarely taste.

So ask which of the following applies to your building. Each one moves the number in a predictable direction. We work through this list before we ever put a figure in front of an owner, and we describe the process on our renovation page.

Five cost drivers you do not get with an apartment

An apartment renovation is bounded. The structure belongs to someone else, the services arrive at the door, and the building is documented. None of that applies to a finca, and five things in particular push the cost up.

Undocumented additions. Many rural properties have grown over decades, and not every extension, terrace roof or converted outbuilding exists in the register. Before you plan anything, the legal status of what is standing has to be clarified. It determines what can be renovated, what can be extended and what a licence will cover. Discovering this after purchase is the single most common reason a project has to be redesigned, and redesign costs both money and months.

Rubble-stone walls. Traditional finca walls are stone set in lime mortar with a filled core. They are thick, irregular and rarely square. Every channel for a cable or a pipe has to be cut carefully by hand. Openings need structural support that a modern wall would not need. Nothing simply screws to it. This adds labour cost in almost every trade, and none of it shows on a plan.

Damp. Rural stone buildings usually sit directly on the ground with no damp-proof course, and traditional construction coped with that by letting the walls dry out through their surface. Seal such a building with the wrong materials and moisture moves somewhere else, typically into the newly finished surfaces. Done properly, floor build-up, ventilation and vapour-open materials are planned together. Cutting corners here usually means paying twice.

Autonomous water and power. Many fincas are off the mains for one or both. That means a cistern or well, pumps, filtration and treatment, solar panels and batteries, sometimes a generator, and wastewater treatment on the plot. These systems have to be sized for how you will actually use the house, and a house occupied in August by twelve people is a different engineering problem from a couple in winter. Urban renovations do not have this line in the budget at all.

Access logistics. A narrow track, a long unsurfaced approach or no turning space for a lorry changes how every material reaches the site and how every trade prices the job. Deliveries get split, machinery gets restricted, and days get longer. Trades charge for distance, and rightly so. This alone can make a finca noticeably more expensive than the same work in town.

Finca or townhouse: the same range, different drivers

A casa de pueblo sits in the same bracket, roughly 1,200 to 2,500 € per square metre as of 2026 and as a rough range. Different things push the cost up. A townhouse is usually connected to mains water, electricity and drainage, so there are no autonomous systems to pay for. Instead you have party walls with neighbours you must coordinate with, streets too narrow for a skip or a lorry, scaffolding that occupies a public street and needs permission, vertical layouts across three or four narrow floors, and sometimes protected facades that limit what may change on the outside.

Each building type comes with its own difficulties, and neither is reliably cheaper. Which one suits you depends on how you want to live and how much of your own infrastructure you are willing to run. We compare the two in detail in our article on finca or townhouse on Mallorca.

The kitchen is the most expensive single room

In nearly every project we build on the island, the kitchen is the room where the most money goes. Our published Mallorca figures, as of 2026 and as rough ranges, run from roughly 20,000 to 30,000 € for an entry-level quality kitchen, roughly 30,000 to 60,000 € for a mid-range bespoke kitchen, and roughly 60,000 to 120,000 € for high-end work, with top projects reaching up to 150,000 €.

With that share of the total budget, the kitchen should be decided early. Two things make finca kitchens more demanding than the same kitchen elsewhere. Irregular walls mean bespoke cabinetry if you want clean joints. And the kitchen usually has to be the room where people gather in winter and the base for eating outdoors in summer. The full breakdown by quality level is in our kitchen price guide for Mallorca.

How the schedule affects cost

A whole-house project typically runs 6 to 12 months including planning and construction, with exceptions in both directions. The construction phase itself starts at 4 to 6 months and can run longer. These are typical ranges from our own projects, as of 2026, not promises, and that is how we explain them to every owner.

Time and budget are linked because you can partly pay for speed. Some contractors work faster at a higher price. On Mallorca, availability is very seasonal: planning a year ahead gets you better terms, and deciding in spring tends to cost more or mean waiting. Delay costs money too. A house that is not finished cannot be used or let, and a longer programme has its own running costs for the owner. When someone asks us to shorten a schedule, we tell them what it will cost.

Permits set the schedule, and so the budget

Cost guides rarely mention permits, although a delay before the site opens costs as much as a delay on site. The figures below are official and legal figures, not our studio experience, and they should be re-verified for your municipality before you rely on them.

For substantial works classed as obra mayor in Palma, the licencia urbanística has an official maximum of three months for the express resolution, counted from a complete submission. In practice it often takes longer. Note the words "complete submission": the clock only starts once every document is in, and handing in a first set does not count. Smaller works generally run as obra menor via comunicación previa or declaración responsable, where works may often begin on submission if the requirements are met, and straightforward cases are processed within days up to about two weeks. Municipal ordinances differ across Mallorca, so all of this depends on the municipality, and a finca in a rural or protected zone can involve consultees beyond the town hall.

For the budget, this means: a project where the permit route is planned from the first sketch usually starts on time. Design first and adjust to the rules afterwards, and you pay twice, in fees and in a lost construction season.

The cost drivers at a glance

Cost driver What it affects Typical decision
Legal status of what is built What may be renovated, extended or licensed at all Clarify before purchase, or before any design work begins
Structural condition of walls and roof The part of the budget you will never see, spent before any finish is chosen Survey properly and plan with the findings
Damp and floor build-up Durability of every surface above it Solve floor, ventilation and vapour-open materials together
Water, power and wastewater autonomy A budget line that urban projects do not have Size for the highest real occupancy
Access to the plot Every delivery, every machine, every trade's price Establish access early so contractors can price it accurately
Layout changes versus keeping the plan Structure, services routing, permit category Decide layout once, in the design phase, and hold it
Level of finish and joinery Where a project sits within the per square metre range Choose the level room by room
Kitchen and bathrooms The highest cost per square metre Fix the quality level early, as it shapes the whole budget
Programme and season Contractor availability and price Plan a season ahead

How we build a budget before you commit

We start from the building. We establish what is legally there, what the fabric will allow, what the plot needs in terms of water, power and access, and what you want from the house. Only then do we work out a figure.

The estimate we then give you is priced with the contractors who would build the project. We do not use published averages for it. That way the figure still holds when the first wall is opened. We handle construction management ourselves, so the contractors who priced the work report to the team that designed it. If the fabric turns up a surprise, we resolve it with the design and the budget in view at the same time.

What owners tell us they value most is that we say so when a property will not give them what they hope for at a budget they are comfortable with. That conversation is better had before a purchase than after. How we work on the island is set out on our Mallorca page.

FAQ

How much does it cost to renovate a finca in Mallorca?

As of 2026 and as a rough range, a full finca renovation runs roughly 1,200 to 2,500 € per square metre. The lower end applies to a structurally sound building with a modest, well judged specification. The upper end applies where structural work has to come first, or where the finish matches a high-quality new build. Where a specific property lands depends mainly on the legal status of what is built, the condition of walls and roof, damp, autonomous water and power systems, and access for trades. Taste plays a smaller part.

How long does a finca renovation take?

A whole-house project typically takes 6 to 12 months including planning and construction, with exceptions running shorter or longer. The construction phase alone starts at 4 to 6 months and can run longer. These are typical ranges as of 2026 rather than promises. Speed is partly a budget question, since some contractors work faster at a higher price. Permit processing comes before all of it and depends on the municipality.

Do I need a licence to renovate a finca?

Yes, and which one depends on the scope of the works and on the municipality. The following are official figures, not our studio's experience: substantial works classed as obra mayor in Palma require a licencia urbanística with an official maximum of three months for the express resolution, counted from a complete submission, though in practice it often takes longer. Smaller works generally run as obra menor via comunicación previa or declaración responsable, where works may often start upon submission if the requirements are met and straightforward cases are processed within days up to about two weeks. Municipal ordinances differ across Mallorca, so verify the route for your municipality before planning around it.

Is it cheaper to renovate a townhouse than a finca?

Not reliably. Both sit in the same bracket, roughly 1,200 to 2,500 € per square metre as of 2026 and as a rough range, but the drivers differ. A townhouse is normally on mains water, power and drainage, which removes the autonomous systems that fincas carry. Against that it brings party walls, neighbour coordination, narrow streets that complicate deliveries and scaffolding, vertical layouts, and sometimes protected facades. A finca has infrastructure and access costs that a townhouse does not. Choose the building for how you want to live, then budget for the costs that come with it.

Your next step

If you own a finca on Mallorca or are considering one, what you need before committing is a realistic figure for that particular house. In one conversation, the CARLO Design Project Check, you get an estimate priced with our own contractor network, a straight answer on what the building allows, and a clear view of the schedule and the permit route. Get in touch and tell us about the property.

What your own project will roughly cost, you can work out in two minutes. Work out your budget →